plc:plc_gas_cutting_implementation
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
plc:plc_gas_cutting_implementation [2017/06/07 00:37] – skirillov | plc:plc_gas_cutting_implementation [2017/06/07 00:41] – skirillov | ||
---|---|---|---|
Line 288: | Line 288: | ||
=== Gas Cutting Control with Initial Height positioning === | === Gas Cutting Control with Initial Height positioning === | ||
- | {{gas-control-004.png? | + | {{mycnc-plc-gas-control-004.png? |
* H1 - Safe Height, defined as distance from cutting height at the end of previous cut. Ignition process started on Safe Height. A system waits 1-2 seconds for stable flame process, then switch to Preheat Process and moves torch down to - | * H1 - Safe Height, defined as distance from cutting height at the end of previous cut. Ignition process started on Safe Height. A system waits 1-2 seconds for stable flame process, then switch to Preheat Process and moves torch down to - |
plc/plc_gas_cutting_implementation.txt · Last modified: 2021/11/02 17:20 by ivan